The Marion WWTP project was a complex multifaceted project that encompassed all aspects of the process of an in use WWTP facility over a two year period. It involved detailed coordination with Kokosing Industrial, the controls supplier, as well as the owner for the upgrades and new construction for the working WWTP. LEE installed over 80 miles of conduit, power wire and control cabling.
Wastewater Treatment Plant
Market
99,450
Power Wire Quantity Installed (no. of linear feet)
120
Fixtures Quantity Installed (no. of fixtures)
59,385
Conduit Quantity Installed (no. of linear feet)
284,850
Low-Voltage Cable Quantity Installed (no. of linear feet)