Akron Children’s Hospital is in the process of renovating their distribution system. This project includes the removal of an 800 KW generator and the installation of a new 1750 KW generator on the other side of the facility. A 2,000 Amp feeder was run approximately 700 feet through the basement and tunnels from the new generator paralleling gear to a new distribution room that refeeds existing switchgear and a new addition.
Healthcare
Market
15,000
Project Area (sq. ft.)
1
Floor
Plan and Spec
Project Delivery Method
4
Peak Field Force